|
The drilling rig
MBo 3000 for pole holes is a special
development of SATVIA GmbH to put up masts for overhead lines.
Using
the MBo 3000 it is possible to realize first the foundation borehole and
afterwards putting the mast without changing the vehicle location .
After drilling the complete drilling unit goes back, the bore hole is
free. Now the mast can be put up and lined up exactly with the help of the jib.
The separate components of the drilling rig are installed on an
off-road vehicle. Working operations are carried out with a central control
desk which allows a good workplace overview.
|